Laying Instructions: Sand should be spread and swept over the area and further vibrated to fill joints. Pavers should be laid with hand tight to pattern of 2” sand bed. Complete laying operations like cutting, vibrating and joint filling (with sand) are to be done on the same day. It is important to note that the laying operations should not be done on a piecemeal basis.